Pre-Construction |
Environmental Impact Assessment (EIA/ĐTM) |
- Groundwater extraction $\ge 500m^3$/day
- Surface water extraction $\ge 50.000m^3$/day
|
Before construction or expansion |
|
Pre-Operation |
Environmental License (GPMT) |
- Domestic wastewater $\ge 50 m^3$/day
- Hazardous waste $> 100kg$/month or $> 1200kg$/year
|
At least 15 days before trial operation |
|
Pre-Operation |
Environmental Registration |
Projects not subject to Environmental License |
Before construction or operation |
|
Pre-Operation |
Trial Operation of Waste Treatment Works |
Projects with new or upgraded treatment systems |
Plan notice 15 days prior; Duration < 6 months |